What has the school district spent for deferred maintenance at AMMS?

From 2000 to 2010, there has been approximately $900,000 in spending on various aspects of the facility needs, including $220,000 on building repairs, $200,000 on heating and plumbing repairs, $100,000 in electrical repairs and $40,000 for major roof repairs. A town grant also provided over $300,000 in funds for major upgrades to meet ADA requirements of the building.

On-going work to other district buildings include a replacement of the heating system at C.T. Plunkett Elementary School, replacement of boilers at Cheshire Elementary School and replacement of the roof at Hoosac Valley High School.

Advertisements
%d bloggers like this: