Painting, Rainwater collection, Music Room, Steel Reinforcements

For the week of December 30, 2011:

Steel reinforcement for a small hole cut into a hallway

Steel reinforcement for a small hole cut into a hallway

Installation of water pipes for pump room

Installation of water pipes for pump room

Spray fire retardant applied on ceiling of new addition

Spray fire retardant applied on ceiling of new addition

Steel reinforcement for a small hole cut into a pre-stressed “T”

Steel reinforcement for a small hole cut into a pre-stressed “T”

A full lot of workers on the site each day

A full lot of workers on the site each day

Music room wall studs

Music room wall studs

Roof mounted heating unit is being lowered into place

Roof mounted heating unit is being lowered into place

Pool is now ready for rainwater collection tanks

Pool is now ready for rainwater collection tanks

New roof fascia panels

New roof fascia panels

Painting has begun

Painting has begun

Advertisements

, , ,

  1. Leave a comment

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

%d bloggers like this: