Rain water tank, sheetrock, data wiring, and a winning team!

Several sets of photos to catch up on this week!  There will be 2 or 3 posts this week.  It’s starting to look like a school again…

For the week of December 22nd:

Past Hoosac Valley and Adams High students who are working on the project!

Past Hoosac Valley and Adams High students who are working on the project!

Data wiring in Middle School area

Data wiring in Middle School area

Fire resistant spray was applied to steel structures

Fire resistant spray was applied to steel structures

Insulated ducts and pipes in hallway

Insulated ducts and pipes in hallway

Sheetrock taping

Sheetrock taping

Old Kelwall panel being removed, new one on the right

Old Kelwall panel being removed, new one on the right

Preparation of pool floor for rain water tank installation

Preparation of pool floor for rain water tank installation

Advertisements

, , , ,

Leave a comment

South Addition, Kelwall Installation, Pipe Insulation, Fire Resistance

Photos taken on December 6th & 8th:

1st block for wall on south addition

1st block for wall on south addition

Spray foam insulation being applied

Spray foam insulation being applied

Last Kalwall panel being installed in middle school gym (pool)

Last Kalwall panel being installed in middle school gym (pool)

Fire resistant treatment has begun to be applied to new steel structures LikeViews: 0

Fire resistant treatment has begun to be applied to new steel structures

Pipe insulation being installed

Pipe insulation being installed

Trenches and footing holes in cafeteria

Trenches and footing holes in cafeteria

, , , , ,

Leave a comment

Middle School Gym, Wiring, Insulation

Photos from the week of November 29, 2011:

Floor prep in music room

Floor prep in music room

New Kelwall panel installation commenced in south side of middle school gym

New Kelwall panel installation commenced in south side of middle school gym

New window sill installation on north side of middle school gym (old pool)

New window sill installation on north side of middle school gym (old pool)

Courtyard drainage system being installed

Courtyard drainage system being installed

Spray foam applied to a wall in the high school lab

Spray foam applied to a wall in the high school lab

Wiring in process

Wiring in process

, , , , , ,