Mid-December and Work Continues

From December 13 & 15:

Masonry work coming together in new south (main) entrance

Masonry work coming together in new south (main) entrance

Footing preparations in cafeteria

Footing preparations in cafeteria

Wiring installation

Wiring installation

New fencing at track

New fencing at track

Library ductwork insulation

Library ductwork insulation

Steel supports needed for one new roof penetration

Steel supports needed for one new roof penetration

Cafeteria footing poured

Cafeteria footing poured

New roof over Main Entrance

New roof over Main Entrance

New boilers

New boilers!

New classroom wiring

New classroom wiring

High school gym old vs. new Kelwall panels

High school gym old vs. new Kelwall panels

Advertisements

, , , , , , ,

Leave a comment

Main Entrance, Courtyard Addition, Window Prep – Big Changes!

The following photos of the project were taken during the week of November 12:

The south main entrance takes shape

The south main entrance takes shape

New precast panels installed outside west side lab windows

New precast panels installed outside west side lab windows

Almost complete patch at former roof penetration

Almost complete patch at former roof penetration

Removal of Roof Vent

Removal of Roof Vent

Steel being erected for courtyard edition

Steel being erected for courtyard edition

Steel being erected for courtyard edition

Steel being erected for courtyard edition

Steel roof deck complete over south addition

Steel roof deck complete over south addition

Wall studs installed in classroom

Wall studs installed in classroom

Precast panel installed beneath window opening

Precast panel installed beneath window opening

Precast panels awaiting installation at window openings

Precast panels awaiting installation at window openings

Seismic footing in the music room

Seismic footing in the music room

Drainage work for the football field

Drainage work for the football field

, , , , , ,

Leave a comment

Last Week of October – Roof Panels, Windows, and Seismic Footing!

Photos from the week of October 27, 2011:

Roof panels

Roof panels installed over the new main entrance

Cleaned out auditorium

Cleaned out auditorium

football drainage ditch

New drainage for the football field

fascia panels

Removal of fascia panels in courtyard in preparation for the new addition

Window opening

Window openings are prepped for new window installation

Seismic footing

New seismic footing installed in the music room

, , , , , ,