Painting, Rainwater collection, Music Room, Steel Reinforcements

For the week of December 30, 2011:

Steel reinforcement for a small hole cut into a hallway

Steel reinforcement for a small hole cut into a hallway

Installation of water pipes for pump room

Installation of water pipes for pump room

Spray fire retardant applied on ceiling of new addition

Spray fire retardant applied on ceiling of new addition

Steel reinforcement for a small hole cut into a pre-stressed “T”

Steel reinforcement for a small hole cut into a pre-stressed “T”

A full lot of workers on the site each day

A full lot of workers on the site each day

Music room wall studs

Music room wall studs

Roof mounted heating unit is being lowered into place

Roof mounted heating unit is being lowered into place

Pool is now ready for rainwater collection tanks

Pool is now ready for rainwater collection tanks

New roof fascia panels

New roof fascia panels

Painting has begun

Painting has begun

Advertisements

, , ,

Leave a comment

New Electrical Room, Insulation, New Walls, More Drainage Upgrades

Photos from December 6, 2011:

Trench in music area hallway

Trench in music area hallway

Patched former opening in ceiling

Patched former opening in ceiling

New electrical room awaiting pouring of floor

New electrical room awaiting pouring of floor

Kelwall installation in Middle School gym

Kelwall installation in Middle School gym

Middle School hallway to gym/cafeteria area

Middle School hallway to gym/cafeteria area

Arts Entrance

Arts Entrance

Library

Library

Soccer field drainage has been upgraded

Soccer field drainage has been upgraded

South (main) entrance

South (main) entrance

Insulated exterior walls

Insulated exterior walls

Sheetrock/plywood wall installed in classroom

Sheetrock/plywood wall installed in classroom

Atrium as viewed from Middle School area

Atrium as viewed from Middle School area

, , , ,

Leave a comment

Last Week of October – Roof Panels, Windows, and Seismic Footing!

Photos from the week of October 27, 2011:

Roof panels

Roof panels installed over the new main entrance

Cleaned out auditorium

Cleaned out auditorium

football drainage ditch

New drainage for the football field

fascia panels

Removal of fascia panels in courtyard in preparation for the new addition

Window opening

Window openings are prepped for new window installation

Seismic footing

New seismic footing installed in the music room

, , , , , ,