Posts Tagged music
Painting, Rainwater collection, Music Room, Steel Reinforcements
Posted by Hurricane Pride in Building Committee on January 30, 2012
For the week of December 30, 2011:

Steel reinforcement for a small hole cut into a hallway

Installation of water pipes for pump room

Spray fire retardant applied on ceiling of new addition

Steel reinforcement for a small hole cut into a pre-stressed “T”

A full lot of workers on the site each day

Music room wall studs

Roof mounted heating unit is being lowered into place

Pool is now ready for rainwater collection tanks

New roof fascia panels

Painting has begun
New Electrical Room, Insulation, New Walls, More Drainage Upgrades
Posted by Hurricane Pride in Construction Updates on December 15, 2011
Photos from December 6, 2011:
Trench in music area hallway
Patched former opening in ceiling
New electrical room awaiting pouring of floor
Kelwall installation in Middle School gym
Middle School hallway to gym/cafeteria area
Arts Entrance
Library
Soccer field drainage has been upgraded
South (main) entrance
Insulated exterior walls
Sheetrock/plywood wall installed in classroom
Atrium as viewed from Middle School area
Last Week of October – Roof Panels, Windows, and Seismic Footing!
Posted by Hurricane Pride in Construction Updates on November 22, 2011
Photos from the week of October 27, 2011:
Roof panels installed over the new main entrance
Cleaned out auditorium
New drainage for the football field
Removal of fascia panels in courtyard in preparation for the new addition
Window openings are prepped for new window installation
New seismic footing installed in the music room